How Do You Install Solar Panels at Home: A Complete DIY Guide for Bangladesh

Installing solar panels at home involves careful planning, proper safety measures, and understanding the differences between DIY and professional installation. For beginners in Bangladesh, this process typically takes 1-3 weekends with proper preparation, includes choosing between rooftop or ground-mounted systems, and requires regular maintenance to ensure optimal performance in tropical conditions.
DIY vs Professional Installation: Which Should You Choose?

Comparison chart showing DIY vs professional solar panel installation options
DIY Installation Benefits
Cost Savings: DIY installation can save thousands of dollars in labor costs and reduce your payback period significantly. You only pay for materials and any electrician help you may need for final connections.
Control Over Process: Installing yourself gives you complete control over timing, quality, and understanding of your system. You learn every component and can troubleshoot issues better.
Learning Experience: Understanding your system helps with future maintenance and repairs.
When to Choose DIY
Choose DIY installation if you:
- Are comfortable climbing on roofs and working at heights
- Have basic construction skills and can use power tools
- Can handle simple1-3 weekends available for the project
- Want to save on installation costs
Professional Installation Benefits
Safety Assurance: Professional installers follow strict safety protocols and have proper equipment for working at heights.
Expertise and Speed: Professionals complete installations faster and handle complex wiring, permits, and grid connections.
Warranties: Many manufacturers require professional installation to maintain warranties.
When to Choose Professional Installation
Choose professional installation if you:
- Are uncomfortable working on roofs or at heights
- Lack electrical experience
- Have a complex roof design or structural concerns
- Want comprehensive warranties and guarantees
- Prefer minimal personal involvement
Rooftop vs Ground-Mounted Systems: What Works Best in Bangladesh?
Rooftop Solar Systems
Advantages for Bangladeshi Homes:
- Space Efficient: Uses otherwise unused roof space, ideal for dense urban areas
- Lower Cost: Installation costs average $27,200 compared to $40,000 for ground-mounted systems
- Security: Panels are less accessible to theft or damage
- No Land Requirements: Perfect for smaller properties common in Bangladesh
Optimal Setup for Bangladesh:
- Orientation: Panels should face south for maximum efficiency in Bangladesh
- Tilt Angle: Fixed panels should be tilted 22.5° ± 1° from horizontal for optimal performance
- Spacing: Ensure proper ventilation between panels and roof surface for cooling
Considerations:
- Roof must be structurally sound and able to support panel weight
- Limited by roof size and orientation
- More difficult to access for cleaning and maintenance
Ground-Mounted Systems
Advantages:
- Optimal Performance: Can be positioned at perfect angle and orientation for maximum sun exposure
- Easy Maintenance: Simple access for cleaning and repairs
- Expandable: Easier to add more panels in the future
- Better Cooling: Ground systems have better airflow, important in Bangladesh’s hot climate
Disadvantages:
- Higher Cost: More expensive due to additional mounting hardware and site preparation
- Land Requirements: Needs significant open space
- Potential Shading: Risk from growing vegetation or structures
Best Choice for Bangladesh
Rooftop systems are generally better for most Bangladeshi homes because they:
- Utilize limited urban space efficiently
- Cost less to install
- Work well with Bangladesh’s strong solar radiation (4-6 kWh/m² daily)
- Are better protected from monsoon flooding
Step-by-Step Installation Guide
Phase 1: Planning and Preparation
1. Assess Your Energy Needs
- Review 12 months of electricity bills to determine average consumption
- Calculate daily energy requirements in kilowatt-hours (kWh)
- Determine what percentage of your power you want from solar
2. Site Assessment
- Ensure your installation area receives 5+ hours of direct sunlight daily
- Check for shading from trees, buildings, or other obstructions
- Verify roof condition can support panel weight (approximately 2-4 pounds per square foot)
3. System Design
- Choose between grid-tied or off-grid system based on your needs
- Select appropriate panel wattage and quantity
- Plan electrical layout and component placement
Phase 2: Equipment and Permits
4. Purchase Components
Ensure all equipment meets Bangladesh standards set by SREDA:
- Solar panels (IEC 61215:2016 standard)
- Inverter (IEC 62109-1:2016 and 62109-2:2016 standards)
- Mounting hardware
- DC and AC disconnect switches
- Wiring and conduits
- Safety equipment (helmet, gloves, harness)
5. Obtain Permits
- For systems under 5MW, apply for waiver certificate from Bangladesh Energy Regulatory Commission (BERC)
- Systems under 250KW require only notification letter to BERC
- Ensure compliance with local building codes
Phase 3: Installation Process
6. Set Up Safety Equipment
- Install scaffolding or safety equipment before starting
- Use proper personal protective equipment (PPE): safety glasses, gloves, helmet, fall protection harness
- Never work alone – have a helper present
7. Install Mounting System
- Mark positions for roof anchors or ground mounting posts
- Drill holes and secure mounts to structural rafters (for rooftop) or concrete footings (for ground-mount)
- Seal all roof penetrations to prevent leaks
- Install rails on mounting system
8. Mount Solar Panels
- Position panels on rails at optimal tilt angle (18-36 degrees for maximum efficiency)
- Secure panels with clamps, ensuring all bolts are properly tightened
- Leave adequate spacing between panels for airflow
9. Electrical Connections
- Connect panels using MC4 connectors in series or parallel configuration
- Install DC disconnect switch between panels and charge controller
- Connect charge controller, inverter, and battery (if off-grid system)
- Install AC disconnect switch and connect to main electrical panel
10. System Testing
- Turn on DC disconnect and check voltage readings
- Test inverter operation and AC output
- Verify all connections are secure and working properly
- Monitor system performance for first few days
Safety Best Practices for Solar Installation
Essential Safety Equipment
Personal Protective Equipment (PPE):
- Safety harness and fall protection gear
- Hard hat or helmet
- Safety glasses
- Non-slip shoes with good grip
- Work gloves (insulated for electrical work)
- High-visibility clothing
Electrical Safety
- Turn off main electrical power
- Use lockout/tagout procedures
- Test all circuits before touching
- Use insulated tools when working with live wires
- Never work during storms or wet conditions
Working at Heights
- Use proper ladder placement (1:4 ratio)
- Install scaffolding for extended work periods
- Work with a partner – never alone
- Avoid working during high winds or storms
- Check roof condition before stepping on it
Bangladesh-Specific Safety Considerations
- Avoid installation during monsoon season
- Work during cooler morning or evening hours
- Stay hydrated and take frequent breaks
- Be aware of increased slip risk on wet surfaces
- Protect equipment from humidity and rain
Maintenance Checklist for Bangladesh’s Climate
Monthly Maintenance Tasks
- Check panels for cracks, discoloration, or physical damage
- Look for loose or corroded connections
- Inspect mounting hardware for stability
- Check for debris, leaves, or bird droppings on panels
- Verify inverter is showing normal readings
- Record monthly energy production
- Compare output to expected levels
- Check for significant drops in performance
- Monitor inverter display for error codes
Quarterly Maintenance (Every 3 Months)
- Best Time: Early morning or late afternoon when panels are cooler
- Method: Use soft brush or squeegee with mild soapy water
- Avoid: Harsh chemicals, abrasive materials, or cleaning during peak sun hours
- Frequency: Every 2-3 months in Bangladesh’s dusty conditions
- Inspect all wiring for damage or wear
- Check DC and AC disconnect switches
- Verify all connections are tight and corrosion-free
- Test ground fault protection systems
Semi-Annual Maintenance (Every 6 Months)
- Check mounting structure for rust or corrosion
- Inspect roof seals around mounting points
- Trim nearby vegetation that may cause shading
- Clean inverter ventilation areas
- Check battery condition (if applicable)
- Compare 6-month performance to previous periods
- Identify any declining panels or system components
- Schedule professional inspection if performance drops significantly
Annual Maintenance
- Hire qualified technician for electrical testing
- Thermal imaging to detect hot spots or failing cells
- Structural assessment of mounting system
- Comprehensive system performance evaluation
- Adjust panel tilt if using adjustable mounts
- Update monitoring system software
- Review and update maintenance records
- Plan for any necessary repairs or upgrades
Bangladesh Climate-Specific Maintenance
- Ensure drainage around ground-mounted systems is clear
- Check waterproof seals on electrical connections
- Secure all loose components before heavy weather
- Remove debris that could block drainage
- Monitor for overheating issues
- Ensure adequate ventilation around panels and inverter
- Increase cleaning frequency due to dust accumulation
- Check for thermal expansion effects on mounting hardware
Salt Air Protection (for coastal areas):
- Rinse panels with fresh water monthly to remove salt deposits
- Inspect metal components for corrosion more frequently
- Apply protective coatings to mounting hardware if needed
Cost Considerations and Permits
Installation Costs in Bangladesh
DIY Installation Savings:
- Material costs: 50,000-200,000 BDT depending on system size
- Professional installation adds: 30-50% to total cost
- DIY can save: 15,000-75,000 BDT in labor costs
Professional Installation:
- Complete system with installation: 75,000-300,000 BDT
- Includes permits, inspections, and warranties
- Often includes maintenance packages
Permit Requirements
Bangladesh Regulatory Framework:
- Systems under 250KW: Notification letter to BERC required
- Systems 250KW-5MW: Waiver certificate from BERC required
- All imported equipment must meet BSTI certification
- Commercial installations may require additional permits
Government Incentives
- Net metering available for grid-connected systems
- Tax incentives for renewable energy installations
- Reduced import duties on solar equipment
- Mandatory solar requirements for new commercial buildings
Ready to start your solar journey? Calculate your home’s solar potential using online tools, get quotes from certified installers in your area, or start planning your DIY installation with our detailed guide. Remember, whether you choose DIY or professional installation, proper planning and safety should always be your first priority.
TL;DR
- DIY installation can save significant money but requires basic construction skills and electrical knowledge
- Rooftop systems are generally better for Bangladesh due to space constraints and lower costs
- Safety first: Always use proper PPE and work with a partner when installing
- Regular maintenance is crucial in Bangladesh’s tropical climate – clean panels every 2-3 months
- Professional help recommended for electrical connections and complex installations
- Permits required: Contact BERC for systems over 250KW capacity
- Best results: South-facing panels tilted at 22.5° for optimal performance in Bangladesh
About the Expert
Muhammad Nayeem Ferdous is the Chairman and Founder of AmarGhorBD, providing 360-degree property services across Bangladesh. With an MBA from Macquarie University and over 5 years of experience in the renewable energy sector, he specializes in helping homeowners transition to sustainable energy solutions. His expertise spans solar installation, property development, and sustainable building practices tailored to Bangladesh’s unique climate and regulatory environment.
People Also Ask
How long does solar panel installation take?
DIY installation typically takes 1-3 weekends for beginners, while professional installation is completed in 1-2 days. The timeline depends on system size, roof complexity, and permit processing time.
Do I need permission to install solar panels in Bangladesh?
Yes, systems over 250KW require a waiver certificate from BERC, while smaller systems need only a notification letter. All equipment must meet BSTI certification standards.
How much maintenance do solar panels need in tropical climates?
In Bangladesh’s tropical climate, panels should be cleaned every 2-3 months, with monthly visual inspections and annual professional check-ups. The high humidity and dust require more frequent attention than temperate climates.
Can I expand my solar system later?
Yes, both rooftop and ground-mounted systems can be expanded, though ground-mounted systems are easier to expand. Plan for future expansion during initial installation by oversizing electrical components.
What happens to solar panels during monsoon season?
Solar panels are designed to withstand heavy rain and wind. Ensure proper drainage, secure mounting, and waterproof electrical connections before monsoon season. Performance may decrease during cloudy days but resumes normal operation when sunny.
How do I know if my roof is suitable for solar panels?
Your roof should be structurally sound, receive 5+ hours of direct sunlight daily, and face south for optimal performance. Have a structural engineer assess if you’re unsure about weight capacity.