Installing solar panels at home involves careful planning, proper safety measures, and understanding the differences between DIY and professional installation. For beginners in Bangladesh, this process typically takes 1-3 weekends with proper preparation, includes choosing between rooftop or ground-mounted systems, and requires regular maintenance to ensure optimal performance in tropical conditions.
DIY vs Professional Installation: Which Should You Choose?
Comparison chart showing DIY vs professional solar panel installation options
DIY Installation Benefits
Cost Savings: DIY installation can save thousands of dollars in labor costs and reduce your payback period significantly. You only pay for materials and any electrician help you may need for final connections.
Control Over Process: Installing yourself gives you complete control over timing, quality, and understanding of your system. You learn every component and can troubleshoot issues better.
Learning Experience: Understanding your system helps with future maintenance and repairs.
When to Choose DIY
Choose DIY installation if you:
Are comfortable climbing on roofs and working at heights
Have basic construction skills and can use power tools
Can handle simple1-3 weekends available for the project
Want to save on installation costs
Professional Installation Benefits
Safety Assurance: Professional installers follow strict safety protocols and have proper equipment for working at heights.
Expertise and Speed: Professionals complete installations faster and handle complex wiring, permits, and grid connections.
Warranties: Many manufacturers require professional installation to maintain warranties.
When to Choose Professional Installation
Choose professional installation if you:
Are uncomfortable working on roofs or at heights
Lack electrical experience
Have a complex roof design or structural concerns
Want comprehensive warranties and guarantees
Prefer minimal personal involvement
Rooftop vs Ground-Mounted Systems: What Works Best in Bangladesh?
Rooftop Solar Systems
Advantages for Bangladeshi Homes:
Space Efficient: Uses otherwise unused roof space, ideal for dense urban areas
Lower Cost: Installation costs average $27,200 compared to $40,000 for ground-mounted systems
Security: Panels are less accessible to theft or damage
No Land Requirements: Perfect for smaller properties common in Bangladesh
Optimal Setup for Bangladesh:
Orientation: Panels should face south for maximum efficiency in Bangladesh
Tilt Angle: Fixed panels should be tilted 22.5° ± 1° from horizontal for optimal performance
Spacing: Ensure proper ventilation between panels and roof surface for cooling
Considerations:
Roof must be structurally sound and able to support panel weight
Limited by roof size and orientation
More difficult to access for cleaning and maintenance
Ground-Mounted Systems
Advantages:
Optimal Performance: Can be positioned at perfect angle and orientation for maximum sun exposure
Easy Maintenance: Simple access for cleaning and repairs
Expandable: Easier to add more panels in the future
Better Cooling: Ground systems have better airflow, important in Bangladesh’s hot climate
Disadvantages:
Higher Cost: More expensive due to additional mounting hardware and site preparation
Land Requirements: Needs significant open space
Potential Shading: Risk from growing vegetation or structures
Best Choice for Bangladesh
Rooftop systems are generally better for most Bangladeshi homes because they:
Utilize limited urban space efficiently
Cost less to install
Work well with Bangladesh’s strong solar radiation (4-6 kWh/m² daily)
Are better protected from monsoon flooding
Step-by-Step Installation Guide
Phase 1: Planning and Preparation
1. Assess Your Energy Needs
Review 12 months of electricity bills to determine average consumption
Calculate daily energy requirements in kilowatt-hours (kWh)
Determine what percentage of your power you want from solar
2. Site Assessment
Ensure your installation area receives 5+ hours of direct sunlight daily
Check for shading from trees, buildings, or other obstructions
Verify roof condition can support panel weight (approximately 2-4 pounds per square foot)
3. System Design
Choose between grid-tied or off-grid system based on your needs
Select appropriate panel wattage and quantity
Plan electrical layout and component placement
Phase 2: Equipment and Permits
4. Purchase Components Ensure all equipment meets Bangladesh standards set by SREDA:
Solar panels (IEC 61215:2016 standard)
Inverter (IEC 62109-1:2016 and 62109-2:2016 standards)
Mounting hardware
DC and AC disconnect switches
Wiring and conduits
Safety equipment (helmet, gloves, harness)
5. Obtain Permits
For systems under 5MW, apply for waiver certificate from Bangladesh Energy Regulatory Commission (BERC)
Systems under 250KW require only notification letter to BERC
Ensure compliance with local building codes
Phase 3: Installation Process
6. Set Up Safety Equipment
Install scaffolding or safety equipment before starting
Use proper personal protective equipment (PPE): safety glasses, gloves, helmet, fall protection harness
Never work alone – have a helper present
7. Install Mounting System
Mark positions for roof anchors or ground mounting posts
Drill holes and secure mounts to structural rafters (for rooftop) or concrete footings (for ground-mount)
Seal all roof penetrations to prevent leaks
Install rails on mounting system
8. Mount Solar Panels
Position panels on rails at optimal tilt angle (18-36 degrees for maximum efficiency)
Secure panels with clamps, ensuring all bolts are properly tightened
Leave adequate spacing between panels for airflow
9. Electrical Connections
Connect panels using MC4 connectors in series or parallel configuration
Install DC disconnect switch between panels and charge controller
Connect charge controller, inverter, and battery (if off-grid system)
Install AC disconnect switch and connect to main electrical panel
10. System Testing
Turn on DC disconnect and check voltage readings
Test inverter operation and AC output
Verify all connections are secure and working properly
Monitor system performance for first few days
Safety Best Practices for Solar Installation
Essential Safety Equipment
Personal Protective Equipment (PPE):
Safety harness and fall protection gear
Hard hat or helmet
Safety glasses
Non-slip shoes with good grip
Work gloves (insulated for electrical work)
High-visibility clothing
Electrical Safety
Before Starting Work:
Turn off main electrical power
Use lockout/tagout procedures
Test all circuits before touching
Use insulated tools when working with live wires
Never work during storms or wet conditions
Working at Heights
Roof Safety Protocols:
Use proper ladder placement (1:4 ratio)
Install scaffolding for extended work periods
Work with a partner – never alone
Avoid working during high winds or storms
Check roof condition before stepping on it
Bangladesh-Specific Safety Considerations
Tropical Climate Precautions:
Avoid installation during monsoon season
Work during cooler morning or evening hours
Stay hydrated and take frequent breaks
Be aware of increased slip risk on wet surfaces
Protect equipment from humidity and rain
Maintenance Checklist for Bangladesh’s Climate
Monthly Maintenance Tasks
Visual Inspection:
Check panels for cracks, discoloration, or physical damage
Look for loose or corroded connections
Inspect mounting hardware for stability
Check for debris, leaves, or bird droppings on panels
Verify inverter is showing normal readings
Performance Monitoring:
Record monthly energy production
Compare output to expected levels
Check for significant drops in performance
Monitor inverter display for error codes
Quarterly Maintenance (Every 3 Months)
Cleaning Panels:
Best Time: Early morning or late afternoon when panels are cooler
Method: Use soft brush or squeegee with mild soapy water
Avoid: Harsh chemicals, abrasive materials, or cleaning during peak sun hours
Frequency: Every 2-3 months in Bangladesh’s dusty conditions
Electrical System Check:
Inspect all wiring for damage or wear
Check DC and AC disconnect switches
Verify all connections are tight and corrosion-free
Test ground fault protection systems
Semi-Annual Maintenance (Every 6 Months)
Comprehensive Inspection:
Check mounting structure for rust or corrosion
Inspect roof seals around mounting points
Trim nearby vegetation that may cause shading
Clean inverter ventilation areas
Check battery condition (if applicable)
Performance Analysis:
Compare 6-month performance to previous periods
Identify any declining panels or system components
Schedule professional inspection if performance drops significantly
Annual Maintenance
Professional Inspection:
Hire qualified technician for electrical testing
Thermal imaging to detect hot spots or failing cells
Structural assessment of mounting system
Comprehensive system performance evaluation
System Optimization:
Adjust panel tilt if using adjustable mounts
Update monitoring system software
Review and update maintenance records
Plan for any necessary repairs or upgrades
Bangladesh Climate-Specific Maintenance
Monsoon Season Preparation:
Ensure drainage around ground-mounted systems is clear
Check waterproof seals on electrical connections
Secure all loose components before heavy weather
Remove debris that could block drainage
Hot Season Care:
Monitor for overheating issues
Ensure adequate ventilation around panels and inverter
Increase cleaning frequency due to dust accumulation
Check for thermal expansion effects on mounting hardware
Salt Air Protection (for coastal areas):
Rinse panels with fresh water monthly to remove salt deposits
Inspect metal components for corrosion more frequently
Apply protective coatings to mounting hardware if needed
Cost Considerations and Permits
Installation Costs in Bangladesh
DIY Installation Savings:
Material costs: 50,000-200,000 BDT depending on system size
Professional installation adds: 30-50% to total cost
DIY can save: 15,000-75,000 BDT in labor costs
Professional Installation:
Complete system with installation: 75,000-300,000 BDT
Includes permits, inspections, and warranties
Often includes maintenance packages
Permit Requirements
Bangladesh Regulatory Framework:
Systems under 250KW: Notification letter to BERC required
Systems 250KW-5MW: Waiver certificate from BERC required
All imported equipment must meet BSTI certification
Commercial installations may require additional permits
Government Incentives
Current Policies:
Net metering available for grid-connected systems
Tax incentives for renewable energy installations
Reduced import duties on solar equipment
Mandatory solar requirements for new commercial buildings
Ready to start your solar journey? Calculate your home’s solar potential using online tools, get quotes from certified installers in your area, or start planning your DIY installation with our detailed guide. Remember, whether you choose DIY or professional installation, proper planning and safety should always be your first priority.
TL;DR
DIY installation can save significant money but requires basic construction skills and electrical knowledge
Rooftop systems are generally better for Bangladesh due to space constraints and lower costs
Safety first: Always use proper PPE and work with a partner when installing
Regular maintenance is crucial in Bangladesh’s tropical climate – clean panels every 2-3 months
Professional help recommended for electrical connections and complex installations
Permits required: Contact BERC for systems over 250KW capacity
Best results: South-facing panels tilted at 22.5° for optimal performance in Bangladesh
About the Expert
Muhammad Nayeem Ferdous is the Chairman and Founder of AmarGhorBD, providing 360-degree property services across Bangladesh. With an MBA from Macquarie University and over 5 years of experience in the renewable energy sector, he specializes in helping homeowners transition to sustainable energy solutions. His expertise spans solar installation, property development, and sustainable building practices tailored to Bangladesh’s unique climate and regulatory environment.
People Also Ask
How long does solar panel installation take? DIY installation typically takes 1-3 weekends for beginners, while professional installation is completed in 1-2 days. The timeline depends on system size, roof complexity, and permit processing time.
Do I need permission to install solar panels in Bangladesh? Yes, systems over 250KW require a waiver certificate from BERC, while smaller systems need only a notification letter. All equipment must meet BSTI certification standards.
How much maintenance do solar panels need in tropical climates? In Bangladesh’s tropical climate, panels should be cleaned every 2-3 months, with monthly visual inspections and annual professional check-ups. The high humidity and dust require more frequent attention than temperate climates.
Can I expand my solar system later? Yes, both rooftop and ground-mounted systems can be expanded, though ground-mounted systems are easier to expand. Plan for future expansion during initial installation by oversizing electrical components.
What happens to solar panels during monsoon season? Solar panels are designed to withstand heavy rain and wind. Ensure proper drainage, secure mounting, and waterproof electrical connections before monsoon season. Performance may decrease during cloudy days but resumes normal operation when sunny.
How do I know if my roof is suitable for solar panels? Your roof should be structurally sound, receive 5+ hours of direct sunlight daily, and face south for optimal performance. Have a structural engineer assess if you’re unsure about weight capacity.